I got a work order this week from the spouse and house hold head of design and planning. So on top of the kitchen that starts on the 17th, building the tool storage shed and the two repair calls I got this week, I’ll be building a screened gazebo just in time for the spring sitting outside weather. So how will I fit in bike riding? Easy, now that the time springs forward on Sunday I have plenty of time to work a little, ride a little and drink a lottle.
While waiting for my good friends at Siewers Lumber to deliver the framing I got the 4 pier holes dug, tamped with granite dust and set the brick piers. Then once the load hit the driveway I hit the road for a quick 40 mile ride up to Ashland and back. It’s all about scheduling.
Christmas With Sharon Tate
-
“I guess I kind of lived in a fairytale world... looking at everything
through rose-colored glasses. I probably always will, to a certain extent.”
Sharon...
13 hours ago
No comments:
Post a Comment